{"id":968,"date":"2024-06-28T08:00:00","date_gmt":"2024-06-28T12:00:00","guid":{"rendered":"https:\/\/stpaulstjohnlcms.org\/?p=968"},"modified":"2024-06-27T22:30:34","modified_gmt":"2024-06-28T02:30:34","slug":"st-johns-electrical-work","status":"publish","type":"post","link":"https:\/\/stpaulstjohnlcms.org\/?p=968","title":{"rendered":"St. Johns: Electrical Work"},"content":{"rendered":"\n<p>As we discussed earlier, we have some very old wiring that we are starting to address this week.\u00a0So if you go to the church for any reason, please be aware that some electrical circuits are turned off.\u00a0 -DO NOT turn any breakers back on- since we have open wiring that is being addressed.\u00a0I have attached some pictures of the ongoing work and there is a short summary of what we have found below. We hope to have the main church lighting and front outlets working again by Sunday.<\/p>\n\n\n\n<p>First, some history as noted on our web page:<\/p>\n\n\n\n<p><strong>1899\u00a0<\/strong>Inside covered with \u201ccorrugated tin\u201d (what we would now consider to be \u201cpressed tin\u201d as often seen on antique ceilings of other century old local buildings \u2013 this was a popular interior choice between 1880 and 1930 in the US)<br><strong>1900\u00a0<\/strong>Electric lights were installed<br><strong>1903<\/strong>\u00a0Basement built.<\/p>\n\n\n\n<p>Picture 1.\u00a0\u00a0 The opening in the center of the wall is where the original 1900 electric service was installed.\u00a0\u00a0 Yes, that is the original wiring that was installed in 1900 that you can still see where the new &#8220;corrugated tin&#8221; installed in 1899 (the year before) was cut out. \u00a0\u00a0 There is a splice there that attaches &#8220;newer&#8221; 50&#8217;s electric wiring to that original Knob and Tube wiring.\u00a0 That goes to a junction box in the basement which then attaches to modern romex wiring (with ground wires that don&#8217;t exist in the other two)\u00a0\u00a0 There would have been 4 fuses for 4 circuits in the original box.\u00a0 All of these circuits and wires were still in use, but they have been spliced into and\/or cut off in numerous locations as things were added and changed over 124 years. \u00a0\u00a0 Many of these additions were done by pulling up floorboards in the balcony or placing wiring between the paneling and tin wall.\u00a0 Since the organ pipes cover these areas now, new wiring is going to require new pathways and therefore we had to remove the sections of wall towards the ceiling for access.\u00a0 You can see some of the original old Knob and Tube wiring that fed the wall switches hanging from the ceiling opening as well.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1-768x1024.jpg\" alt=\"Picture 1, described in the paragraph above.\" class=\"wp-image-969\" srcset=\"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1-768x1024.jpg 768w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1-225x300.jpg 225w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1-1152x1536.jpg 1152w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1-1536x2048.jpg 1536w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1-scaled.jpg 1920w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<p>Picture 2.&nbsp; Here you can see that there used to be a light fixture (or two) on the wall above the original switches (the higher cut open portions on the left) in our coat rack alcove.&nbsp;&nbsp; We have removed those switch boxes and new ones were added at an Americans with Disabilities Act height.&nbsp; We figured once the wall was open, now is the time to fix some things to bring us closer to the current electrical standards if it was within reason.&nbsp;&nbsp; You can get a better idea of the wall pattern tin (in pink paint) from this picture. Also you can see the original clear pine wainscoting and the Knob and Tube splices noted in picture one.&nbsp; Also, it should be noted there was no insulation in this wall space in general&#8230; only a little piece of balsam wool in the original electric box location&#8230;.. perhaps because Reino knew at some point we would want to rewire it?&nbsp; Adjoining spaces were insulated.&nbsp; We will insulate once we have the new wiring in place.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc2-1024x768.jpg\" alt=\"\" class=\"wp-image-970\" srcset=\"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc2-1024x768.jpg 1024w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc2-300x225.jpg 300w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc2-768x576.jpg 768w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc2-1536x1152.jpg 1536w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc2-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Picture 3. This one show the tin pattern below the balcony on ceiling and the pattern (different) on the walls. This is the space we had to work in to get new wiring installed to the entry light, and under balcony lights.&nbsp; Some wiring for outlets in the balcony was buried in this space as well but we had no reasonable access so we had to find a different path to power those spaces.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc3-1024x768.jpg\" alt=\"\" class=\"wp-image-971\" srcset=\"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc3-1024x768.jpg 1024w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc3-300x225.jpg 300w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc3-768x576.jpg 768w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc3-1536x1152.jpg 1536w, https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc3-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Some things we&#8217;ve run into:<\/p>\n\n\n\n<p>1. There were no junction boxes installed for the entry and under balcony lights.&nbsp; The light were attached directly to the paper ceiling tiles.&nbsp; The fixtures had run so hot with regular bulbs that coatings on the wires were scorched and in one case bare wire was touching the fixture base.&nbsp; These will all have to be replaced, new boxes cut in and re-fed with new wire.<\/p>\n\n\n\n<p>2. Multiple locations had wire nuts installed, but the wires were -NOT-&nbsp; twisted in the nut.&nbsp; So any pull on the wire would cause the connection to just come apart. (another arcing hazard)<\/p>\n\n\n\n<p>3. I had thought that the front of the church was fed through the basement.&nbsp; A closer look at the history above though shows the reason that isn&#8217;t true.&nbsp; The wiring was installed 3 years before we had a basement!&nbsp; So it all feeds through the attic.&nbsp; Of the 4 original circuits, we are working on replacing 3 of them.&nbsp; The final 4th circuit comes from the basement through all the junctions mentioned in the picture one notes, from there it goes up the wall to the attic, then down the church rafters to above the pulpit, then across the church attic to the parking lot side and then runs down the front wall by the stairway&#8230;..&nbsp; where it then feeds :&nbsp; all of the alter lights (upper and and lower), the outlets on either side, all of the pastors office lights and outlets, the front stairway lights, all of the downstairs Rec room lights,&nbsp; the Kitchen lights, some downstairs outlets, all of the back shed lights and outlets.&nbsp; This is a -very- long run of wire with -many- items on it.&nbsp;&nbsp; This isn&#8217;t great, but we would have to do a -LOT- of destruction to get access to -ANY- of these areas, so for now, even though this is also the circuit that was hit by our lightning strike, we are leaving this circuit in place.&nbsp; If, at some point, we get access to the basement ceiling we would rewire these devices from the bottom.<\/p>\n\n\n\n<p>4. As noted above, as we move some switches around, we will have some holes in the paneling that will need to have blank covers put on them for now.&nbsp; Or if you have&nbsp; picture you like, perhaps we can hang that over them ; )<\/p>\n\n\n\n<p>As always, we thank you for your building fund contributions that let us do this work, and we welcome your comments or suggestions<\/p>\n\n\n\n<p>Thanks!<\/p>\n\n\n\n<p>David<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we discussed earlier, we have some very old wiring that we are starting to address this week.\u00a0So if you go to the church for any reason, please be aware that some electrical circuits are turned off.\u00a0 -DO NOT turn any breakers back on- since we have open wiring that is being addressed.\u00a0I have attached&hellip;&nbsp;<a href=\"https:\/\/stpaulstjohnlcms.org\/?p=968\" rel=\"bookmark\">Read More &raquo;<span class=\"screen-reader-text\">St. Johns: Electrical Work<\/span><\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-968","post","type-post","status-publish","format-standard","hentry","category-st-johns-announcements"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"St. John\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/stpaulstjohnlcms.org\/?p=968\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"-\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"St. Johns: Electrical Work -\" \/>\n\t\t<meta property=\"og:description\" content=\"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/stpaulstjohnlcms.org\/?p=968\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-06-28T12:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-06-28T02:30:34+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"St. Johns: Electrical Work -\" \/>\n\t\t<meta name=\"twitter:description\" content=\"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#blogposting\",\"name\":\"St. Johns: Electrical Work -\",\"headline\":\"St. Johns: Electrical Work\",\"author\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?author=3#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/electrc1.jpg\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968\\\/#articleImage\"},\"datePublished\":\"2024-06-28T08:00:00-04:00\",\"dateModified\":\"2024-06-27T22:30:34-04:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#webpage\"},\"articleSection\":\"St. John's Announcements\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/stpaulstjohnlcms.org\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?cat=5#listItem\",\"name\":\"St. John's Announcements\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?cat=5#listItem\",\"position\":2,\"name\":\"St. John's Announcements\",\"item\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#listItem\",\"name\":\"St. Johns: Electrical Work\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#listItem\",\"position\":3,\"name\":\"St. Johns: Electrical Work\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?cat=5#listItem\",\"name\":\"St. John's Announcements\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/#organization\",\"url\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?author=3#author\",\"url\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?author=3\",\"name\":\"St. John\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/58a7ac3969c54a40c0857afe22a6141b904c87bd49f561313145880760190f5e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"St. John\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#webpage\",\"url\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968\",\"name\":\"St. Johns: Electrical Work -\",\"description\":\"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?p=968#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?author=3#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/?author=3#author\"},\"datePublished\":\"2024-06-28T08:00:00-04:00\",\"dateModified\":\"2024-06-27T22:30:34-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/#website\",\"url\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/stpaulstjohnlcms.org\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"St. Johns: Electrical Work -","description":"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached","canonical_url":"https:\/\/stpaulstjohnlcms.org\/?p=968","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#blogposting","name":"St. Johns: Electrical Work -","headline":"St. Johns: Electrical Work","author":{"@id":"https:\/\/stpaulstjohnlcms.org\/?author=3#author"},"publisher":{"@id":"https:\/\/stpaulstjohnlcms.org\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/stpaulstjohnlcms.org\/wp-content\/uploads\/2024\/06\/electrc1.jpg","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968\/#articleImage"},"datePublished":"2024-06-28T08:00:00-04:00","dateModified":"2024-06-27T22:30:34-04:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#webpage"},"isPartOf":{"@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#webpage"},"articleSection":"St. John's Announcements"},{"@type":"BreadcrumbList","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org#listItem","position":1,"name":"Home","item":"https:\/\/stpaulstjohnlcms.org","nextItem":{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org\/?cat=5#listItem","name":"St. John's Announcements"}},{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org\/?cat=5#listItem","position":2,"name":"St. John's Announcements","item":"https:\/\/stpaulstjohnlcms.org\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#listItem","name":"St. Johns: Electrical Work"},"previousItem":{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#listItem","position":3,"name":"St. Johns: Electrical Work","previousItem":{"@type":"ListItem","@id":"https:\/\/stpaulstjohnlcms.org\/?cat=5#listItem","name":"St. John's Announcements"}}]},{"@type":"Organization","@id":"https:\/\/stpaulstjohnlcms.org\/#organization","url":"https:\/\/stpaulstjohnlcms.org\/"},{"@type":"Person","@id":"https:\/\/stpaulstjohnlcms.org\/?author=3#author","url":"https:\/\/stpaulstjohnlcms.org\/?author=3","name":"St. John","image":{"@type":"ImageObject","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/58a7ac3969c54a40c0857afe22a6141b904c87bd49f561313145880760190f5e?s=96&d=mm&r=g","width":96,"height":96,"caption":"St. John"}},{"@type":"WebPage","@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#webpage","url":"https:\/\/stpaulstjohnlcms.org\/?p=968","name":"St. Johns: Electrical Work -","description":"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/stpaulstjohnlcms.org\/#website"},"breadcrumb":{"@id":"https:\/\/stpaulstjohnlcms.org\/?p=968#breadcrumblist"},"author":{"@id":"https:\/\/stpaulstjohnlcms.org\/?author=3#author"},"creator":{"@id":"https:\/\/stpaulstjohnlcms.org\/?author=3#author"},"datePublished":"2024-06-28T08:00:00-04:00","dateModified":"2024-06-27T22:30:34-04:00"},{"@type":"WebSite","@id":"https:\/\/stpaulstjohnlcms.org\/#website","url":"https:\/\/stpaulstjohnlcms.org\/","inLanguage":"en-US","publisher":{"@id":"https:\/\/stpaulstjohnlcms.org\/#organization"}}]},"og:locale":"en_US","og:site_name":"-","og:type":"article","og:title":"St. Johns: Electrical Work -","og:description":"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached","og:url":"https:\/\/stpaulstjohnlcms.org\/?p=968","article:published_time":"2024-06-28T12:00:00+00:00","article:modified_time":"2024-06-28T02:30:34+00:00","twitter:card":"summary_large_image","twitter:title":"St. Johns: Electrical Work -","twitter:description":"As we discussed earlier, we have some very old wiring that we are starting to address this week. So if you go to the church for any reason, please be aware that some electrical circuits are turned off. -DO NOT turn any breakers back on- since we have open wiring that is being addressed. I have attached"},"aioseo_meta_data":{"post_id":"968","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-06-28 02:30:34","updated":"2025-06-04 02:13:09","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/stpaulstjohnlcms.org\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/stpaulstjohnlcms.org\/?cat=5\" title=\"St. John&#039;s Announcements\">St. John's Announcements<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSt. Johns: Electrical Work\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/stpaulstjohnlcms.org"},{"label":"St. John's Announcements","link":"https:\/\/stpaulstjohnlcms.org\/?cat=5"},{"label":"St. Johns: Electrical Work","link":"https:\/\/stpaulstjohnlcms.org\/?p=968"}],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=\/wp\/v2\/posts\/968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=968"}],"version-history":[{"count":1,"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=\/wp\/v2\/posts\/968\/revisions"}],"predecessor-version":[{"id":972,"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=\/wp\/v2\/posts\/968\/revisions\/972"}],"wp:attachment":[{"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stpaulstjohnlcms.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}