The furnace room has been updated with the addition of a new closet with shelves that have organized our paints and things, and some new peg board to help organize our tools.
To fix the issue where the paint was peeling from the back wall (too much moisture in the stone basement outer wall causing this) that was seen on the way to the men’s room, we have placed a vinyl backdrop in front of the wall to dress the appearance of that area up some. The cement floor in this area was carpeted to reduce trip or slip hazards as well. There is a nice little spot in front of the new backdrop picture to store the vacuum cleaner and things as seen in the attached pictures.
Thanks for all of your patience over the last year as we made these changes. It was much appreciated!
David


